
1. The Contents of the Fitting Kit

2. Fitting Kit Assembled

3. Slide Extension Poles into Base

4. Insert Centre Bolt into Base

5. Screw Extension onto Centre Bolt

6. Insert the 6 legs into Centre Spider

7. Kit ready for use

8. Fit tire as normal and Inflate which will set the beads. Then deflate the tire. NOW place the Centre Bolt under the wheel.

9. Centre Spider with legs resting on tire

10. Two Washers and Bearing

11. Sandwich the Bearing with the Washer

12. Adjust legs ready for compression

13. Screw on the Handle

14. Compress the tire to expose the well

15. Slide in the Tyron Band

16. Insert the Fixing

17. Using the ratchet, tighten the Band

18. Torque to 12Nm
